Case Study – Kentucky

🛠️ BEAMM Case Study – Kentucky State University (Combs Hall)

“Three Days. 650+ Pieces. BEAMM Ran the Floor.”


🏢 Project Overview

  • Client: Smarter Furnishings
  • Location: Combs Hall – Kentucky State University, Frankfort, KY
  • Dates: February 2–5, 2025
  • BEAMM Crew: 7 installers
  • Partner Crew: 12 installers from Smarter Furnishings
  • Scope: Full student housing install — bedroom, lounge, and common areas
  • Leadership: BEAMM led install flow and digital documentation for job tracking

📦 Furniture Installed

  • 110 Twin XL Beds
  • 110 Twin XL Mattresses
  • 110 3-Drawer Wardrobes
  • 222 Stackable 2-Drawer Chests
  • 110 Fully Welded Writing Desks
  • 59 Upholstered Ladder-Back Chairs
  • 1 Full XL Bed + Mattress
  • 1 Dining Table, 1 Coffee Table, 1 Loveseat, 1 Lounge Chair, 1 Bookcase

This install serviced a blend of traditional dorm rooms and upgraded suite-style spaces across multiple floors.


đź’Ş What BEAMM Delivered

  • Operated as the primary install flow leaders onsite
  • Managed iPad tracking and daily install documentation, ensuring every room and product was accounted for
  • Guided install coordination, while one of Smarter’s leads was focused on training a new team member
  • Installed 650+ pieces of furniture across 3 days without delay
  • Maneuvered 110 large wardrobes up narrow staircases — no elevators, no excuses
  • Worked around and in sync with another active crew on-site
  • Delivered all pieces with zero rework, accurate placement, and a clean walk-through

âś… Outcome

  • Project completed on time by February 5th
  • Client received real-time records of completed installs
  • No damage claims or missed units
  • BEAMM’s on-the-ground leadership helped keep the install efficient, clean, and fully documented
Scroll to Top