🛠️ BEAMM Case Study – Wiley University (Marshall, TX)
“Two Buildings. 1,400+ Pieces. One Unified Crew.”
🏫 Project Overview
- Client:Â Smarter Furnishings
 - Location: Wiley University – Marshall, Texas
 - Buildings:Â Jackson Hall & Strickland Hall
 - Install Duration: Late November – Early December
 - Crew:
- 5 installers from BEAMM
 - 12 from Smarter Furnishings
 
 - Scope:Â Full dorm room setups across two residence halls
 - Total Pieces Installed:Â 1,400+ including desks, chairs, wardrobes, and chests
 
🏢 Jackson Hall Install (Order #5226)
Installed:
- 195 Apex Writing Desks
 - 195 Metal Ladder-Back Chairs (upholstered)
 - 195 Franklin 2-Drawer Wardrobes
- 3 units per item for overage
 
 
Challenge:
Jackson Hall’s tight staircases meant that all full-size wardrobes had to be carried by hand, up multiple flights, with no elevator access. This kind of install requires real stamina and tight coordination — BEAMM delivered both, no shortcuts, no damage.
🏢 Strickland Hall Install (Order #5225)
Installed:
- 500 Cornerstone 2-Drawer Chests
 - 500 Apex Writing Desks
 - 5 Apex 6-Drawer Chests
- 3–5 overage units of each
 
 
This half of the project focused on volume at scale — hundreds of units, hundreds of installs, all completed with clean layouts and full staging. BEAMM worked across floors and furniture types while maintaining install consistency.
đź’Ş What BEAMM Delivered
- Matched and supported a larger crew with a lean 5-man team
 - Tackled two full buildings in parallel
 - Lifted and placed 1,400+ pieces of furniture
 - Navigated difficult access routes and tight stairwells
 - Handled full trash and packaging removal site-wide
 
âś… Outcome
- Install completed on time before winter break
 - No product damage or rework
 - All units walk-through ready on final day
 - Another successful tag-team execution with Smarter Furnishings
 